This topic thread is for any issues with turns that you are having, such as garbled printouts, etc. should be posted here. This will help us address problems and glitches with email, etc. We will also post suggestions here for fixes to specific issues.
This is not a gripe board, this is a troubleshooting board. Don’t just say “My turn didn’t work.” be as specific as possible. That way we can work together to fix the issue and make the game better for everyone.
Moderator: Tregonsee
by ImperiumLafayette » Sun Feb 10, 2019 8:21 am
Rift Attack Transport (RAT1) cost:2750 TL:32
Assault Transport 2, Rift (RAT2) cost:750 TL:36
Assualt Transport 3, Rift (RAT3) cost:4200 TL:38
Aside from the fact the naming is inconsistent, the cost listed in the tech sheets for RAT2 must be incorrect as it is actually lower than the RAT1. As I haven't ever built one I don't know what the actual price might be. Best Guess would be 3750.
-
ImperiumLafayette
-
- Posts: 133
- Joined: Tue May 22, 2018 4:06 pm
by Framis » Sun Feb 10, 2019 10:18 am
Check the turn printout. They are named correctly and have costs that seem right.
The tech sheets seem to have quite a few inconsistent entries.
-
Framis
-
- Posts: 87
- Joined: Sun Oct 09, 2016 4:47 pm
by CHARON EMPIRE » Tue Feb 12, 2019 7:10 pm
Maybe this helps if you don't have the tec:
RAT1 Rift Attack Trans1 1950 32 2 250 MARINES
RAT2 Rift Attack Trans2 2800 36 3 400 MARINES
RAT3 Rift Attack Trans3 3900 38 4 600 MARINES
-
CHARON EMPIRE
-
- Posts: 192
- Joined: Tue Aug 19, 2014 4:04 pm
Return to Troubleshooting Board
Who is online
Users browsing this forum: No registered users and 30 guests